Filtering facepieces
Filtering Facepieces (FFP) are disposable Respiratory Protective Equipment (RPE) for protection against dusts, particles and aerosols. They are often referred to as 'disposable dust masks', are widely used, and generally require no cleaning or maintenance.
They are available in three classes: FFP1, FFP2 and FFP3, with the higher numbers corresponding to better filtering efficiency.
As with all types of Personal Protective Equipment (PPE) sold in the UK, they must comply with the EU PPE Directive 89/686/EEC. It is the responsibility of the manufacturer or person placing the RPE on the European single market to ensure compliance. For FFPs this is invariably achieved by compliance with the harmonised standard EN149:2001+A1:2009: Respiratory protective devices. Filtering half masks to protect against particles. Requirements, testing, marking.
See also: Performance of FFP3 disposable respirators.
--BSRIA
[edit] Related articles on Designing Buildings Wiki
- Achieve safety in demolition.
- Asbestos.
- Control of Substances Hazardous to Health (COSHH).
- Deleterious materials.
- Demolition.
- Dust control systems.
- Dust.
- Fit testing.
- Hazardous substances.
- Health and Safety Executive.
- Injuries on construction sites.
- Inspections focus on occupational lung disease.
- Nuisance in construction.
- Performance of FFP3 disposable respirators.
- Personal protective equipment.
- Pollution.
- Reporting accidents and injuries on construction sites.
- Respiratory protective equipment.
- Scabbling.
- The dust control systems market.
- TSI Environmental dust monitoring system.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.

















